Lower Oshiwara metro station

Mumbai Metro's Yellow Line 2A metro station

Preceding station Mumbai Metro Following station
Oshiwara
towards Dahisar East
Line 2A Andheri West
Terminus
Route map
Legend
Line 2
0.0000
Dahisar East Line 7 and Line 9
Mahatma Gandhi Road
0.7110
Anand Nagar
Western line Left arrow Dahanu Road and Churchgate Down arrow
Dahisar River
2.4227
Kandarpada
3.3831
Mandapeshwar
4.4684
Eksar
5.5375
Borivali West
6.4659
Pahadi Eksar
7.5718
Kandivali West
8.2003
Dahanukarwadi
Poisar River
Charkop Depot
9.5355
Valnai
10.8460
Malad West
12.2434
Lower Malad
13.1831
Pahadi Goregaon
14.4555
Goregaon West
15.4687
Oshiwara
Adarsh Nagar Line 6
16.4330
Lower Oshiwara
17.5786
Andheri West
D N Nagar Line 1
18.6376
ESIC Nagar
20.3026
Prem Nagar
20.8292
Indira Nagar (Vile Parle)
21.9025
Nanavati Hospital / Up arrow towards Dahanu Road
23.5094
Khira Nagar and Santacruz on Western line
24.4660
Saraswat Nagar
25.5590
National College (Bandra)
26.6997
Bandra and Bandra on Western line
Left arrow towards Churchgate
28.9139
Income Tax Office (BKC) Line 3
Vakola Nala
30.1880
ILFS, BKC
30.8928
MTNL, BKC
32.7202
SG Barve Marg
Central line Left arrow CSMT and Kalyan Right arrow
Lokmanya Tilak Terminus Flyover Road
Harbour line Left arrow CSMT and Panvel Down arrow
34.3492
Kurla (East)
Line 4
35.3563
Eastern Express Highway
35.9967
Chembur
VNP and RC Marg Junction
on Mumbai Monorail
36.9590
Diamond Garden
37.8190
Shivaji Chowk (Chembur)
Eastern Freeway
38.9396
BSNL, Govandi
Up arrow towards CSMT
40.5467
Mankhurd and Mankhurd on Harbour line
Right arrow towards Panvel
41.5074
Mandala
Mandala Depot
Location
Map

Lower Oshiwara is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Jogeshwari West, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.[1][2][3]

History

Trial runs on section of 2A from Dhanukarwadi to Dahisar East has started from 31 May 2021. Dahisar East commercial operations began on 3 April 2022 with First phase of line 2A.

Station layout

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Andheri West
Platform 1
Northbound
Towards ← Dahisar East next station is Oshiwara
Side platform | Doors will open on the left Disabled access
L2

Power and signaling system

Like all other stations and railways of Mumbai metro, Lower Oshiwara station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

  1. ^ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  2. ^ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
  3. ^ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
  • v
  • t
  • e
Line 2
Operational
Under
Construction
Depot(s)
  • Charkop (2A) & Mandale (2B)
  • * Stations in Italics are Under Construction.