Dahisar East metro station

Mumbai Metro's Yellow Line 2A terminal metro station

  • Ovaripada:
  •       Line 7
ConstructionStructure typeElevated, Double trackParkingNoHistoryOpened2 April 2022; 2 years ago (2022-04-02)Services
Preceding station Mumbai Metro Following station
Terminus Line 2A Anand Nagar
towards Andheri West
Future services
Terminus Line 9
(under construction)
Pandhurang Wadi
Route map
Legend
Line 2
0.0000
Dahisar East Line 7 and Line 9
Mahatma Gandhi Road
0.7110
Anand Nagar
Western line Left arrow Dahanu Road and Churchgate Down arrow
Dahisar River
2.4227
Kandarpada
3.3831
Mandapeshwar
4.4684
Eksar
5.5375
Borivali West
6.4659
Pahadi Eksar
7.5718
Kandivali West
8.2003
Dahanukarwadi
Poisar River
Charkop Depot
9.5355
Valnai
10.8460
Malad West
12.2434
Lower Malad
13.1831
Bangur Nagar
14.4555
Goregaon West
15.4687
Oshiwara
Adarsh Nagar Line 6
16.4330
Lower Oshiwara
17.5786
Andheri West
D N Nagar Line 1
18.6376
ESIC Nagar
20.3026
Prem Nagar
20.8292
Indira Nagar (Vile Parle)
21.9025
Nanavati Hospital / Up arrow towards Dahanu Road
23.5094
Khira Nagar and Santacruz on Western line
24.4660
Saraswat Nagar
25.5590
National College (Bandra)
26.6997
Bandra and Bandra on Western line
Left arrow towards Churchgate
28.9139
Income Tax Office (BKC) Line 3
Vakola Nala
30.1880
ILFS, BKC
30.8928
MTNL, BKC
32.7202
SG Barve Marg
Central line Left arrow CSMT and Kalyan Right arrow
Lokmanya Tilak Terminus Flyover Road
Harbour line Left arrow CSMT and Panvel Down arrow
34.3492
Kurla (East)
Line 4
35.3563
Eastern Express Highway
35.9967
Chembur
VNP and RC Marg Junction
on Mumbai Monorail
36.9590
Diamond Garden
37.8190
Shivaji Chowk (Chembur)
Eastern Freeway
38.9396
BSNL, Govandi
Up arrow towards CSMT
40.5467
Mankhurd and Mankhurd on Harbour line
Right arrow towards Panvel
41.5074
Mandala
Mandala Depot
Location
Map

Dahisar East is the elevated northern terminal station on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This metro station is located on the Western Express Highway in Northern Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was opened to the public on 2 April 2022.

History

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[1] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[2]

Dahisar East was opened to the public on 2 April 2022, along with the first phase of Line 2A.[3]

Station layout

L1
Platforms
Side platform, doors will open on the left
Platform 2      Line 2 toward Andheri West (Anand Nagar)
Platform 1      Line 2 termination platform
Side platform, doors will open on the left
M Mezzanine Fare control, station agent, Metro Card vending machines, crossover
G Street level Exit/Entrance

Power and signaling system

Like all other stations and railways of Mumbai metro, Dahisar East station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

  1. ^ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  2. ^ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  3. ^ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
  • v
  • t
  • e
Line 2
Operational
Under
Construction
Line 7
Depot(s)
  • Charkop (2A) & Mandale (2B)
  • Charkop & Bhayandar (Planned)
  • * Stations in Italics are Under Construction.